I'm 1509, reserved on 2/18/08.
Configured today 9/10/08
My DDE says January - March 2009.
Looks like I'm a little more than half way through the waiting period with 4 to 5 months to go.
When I configured I was using the 2009 model configuration with the option of a solid roof (which I don't want).
