Smart Car of America Forum banner

1 - 12 of 12 Posts

·
Registered
Joined
·
570 Posts
They have 4 months to build something.
Well they better get going, at least on a foundation, working on the outside of the building will be hard once it gets cold. It is promising that from the first time of when I went by the lot and the time I took the pic, it looked like they are mapping out the foundations on the ground and they also dropped off a backhoe, so it looks promising.
 

·
Smart A**
Joined
·
1,141 Posts
I'm not a civil engineer but I think these type of buildings can be finished up for 2-3 months.
The pre-fab steel buildings (which most new delerships build) can go up in a few short weeks after the slab is put in. The interior finish, plumbing and wiring as well as all of the hydraulic lift equipment will tke a lot more time. Though, with a Smart they probablydon't use a lift. 2 men and a boy can just lift the whole thing up on a work bench.:D:D
 

·
Registered
Joined
·
570 Posts
For sure they will only have the showroom on this location, the property is too small for anything but, it seems like they will be servicing them at the MB service just down the street.
 
1 - 12 of 12 Posts
Top